TL;DR: Microsoft positions Agent Framework as the direct successor to both, with migration guides for each. Inventory what each application relies on (plugins and function calling, group-chat orchestration, memory, hosting), pin current behaviour with tests against a scripted model, map each piece (plugins to tools, group chats to sequential, concurrent or Magentic orchestrations or explicit workflows), migrate one application at a time behind the same tests, and keep business logic outside framework types so this is the last painful move.
How to approach it
Treat it as a staged migration with a safety net. The order is inventory, tests, mapping, pilot, roll-out, and decommission.
A strong answer
Inventory. For each application: which Semantic Kernel plugins and functions it registers, how function calling is configured, whether it used planners, which AutoGen agents and conversation patterns it runs, where state and memory live, how it is hosted and traced.
Pin behaviour. Before changing anything, write tests against a scripted model that capture what matters: which tool calls happen for a given request, what is persisted, how errors reach the model, how a group conversation terminates. These become the acceptance criteria for the migrated version.
Map the pieces.
| From | To in Agent Framework |
|---|---|
| Semantic Kernel plugins and functions | Agent tools (function tools, or MCP where shared) |
| Kernel-level filters and logging | Agent middleware |
| AutoGen two-agent or group chats | Sequential, concurrent or Magentic orchestration builders, or an explicit workflow |
| Multi-step processes with human sign-off | Workflows with request_info and response handlers, with checkpoints |
| Bespoke memory | Context providers and sessions |
Pilot. Move the simplest application with the best test coverage first. Compare traces side by side on recorded inputs. Measure latency and cost.
Roll out and decommission. Migrate by application, not by layer. Keep the old version runnable until the new one has passed its tests and a period in production. AutoGen is archived (its repository went read-only on 20 November 2026 and Microsoft no longer ships fixes for it), so AutoGen applications move first; for Semantic Kernel, track Microsoft's current support statement rather than assuming a date.
Reduce the next migration. Keep tools as plain functions with their own tests, prompts and evaluation sets in your repository, and business rules in services the agent calls. The framework should be glue.
What interviewers probe next
"Why not stay on AutoGen or Semantic Kernel?" AutoGen is archived, with no security fixes, so staying is a risk that grows every month. Semantic Kernel may be fine short term, but new capability is going to the successor, and the migration guides exist because Microsoft expects the move. The tests make the timing a choice rather than a scramble.
"What is hardest to migrate?" Emergent behaviour in AutoGen group chats, because termination and turn-taking were implicit. Make them explicit in a workflow or orchestration and test termination.
How it's scored
Weak: Rewrites everything in the new framework at once.
Hire: Maps plugins to tools and group chats to orchestrations; migrates incrementally.
Strong Hire: Inventory, behaviour-pinning tests before changes, explicit mapping table, pilot with trace comparison, per-application roll-out with rollback, support status from current sources, and an architecture that keeps business logic outside the framework.
Common mistakes
- Migrating without tests that define "same behaviour".
- Assuming group-chat termination will carry over.
- Moving business logic into framework-specific types again.